Limestone Crown Molding 2″x12″ – Honed Beige Sophistication
Elevate your interior finishes with the 2″x12″ Honed Beige Limestone Crown Molding. Crafted from premium beige limestone, this trim adds architectural elegance and warmth, seamlessly connecting walls and ceilings in both residential and commercial spaces. Its straight-edge profile and smooth, matte surface showcase the natural beauty of the stone while providing a refined, understated finish.
The subtle honed texture reduces glare and softens transitions, making it ideal for contemporary, minimalist, or classic interiors. Perfect for bathrooms, kitchens, living rooms, or feature walls, this crown molding pairs effortlessly with coordinating limestone tiles to create a cohesive, polished look.
Key Features:
Material: Natural beige limestone
Finish: Honed – smooth, matte, and non-reflective
Size: 2″ x 12″ (5.1 cm x 30.5 cm)
Edge: Straight for clean, seamless installation
Style: Elegant crown molding for ceiling transitions
Bring subtle luxury and architectural harmony to any room with this timeless limestone crown molding.
Installation Guide – Limestone Crown Molding (2″x12″ Honed)
Step 1 — Surface Preparation: Clean and Level
Ensure all surrounding wall or tile surfaces are dry, clean, and smooth.
Draw a level guideline along the top edge where the crown molding will be installed.
Remove any dust, debris, or residue to improve mortar adhesion.
Step 2 — Dry Layout: Plan and Inspect
Dry-lay all crown molding pieces to check tone, veining, and alignment.
Use a wet saw with a fine diamond blade for precise cuts and miters at corners.
Confirm proper fit and alignment along the transition area before setting the pieces permanently.
Step 3 — Adhesive Application: Secure Placement
Recommended Mortars:
Instructions:
Apply a layer of thin-set mortar to the back of each molding piece using a margin trowel.
Back-butter the pieces for full contact and press firmly along the guideline.
Use painter’s tape to hold the molding in place while the mortar cures (minimum 24 hours).
Step 4 — Grouting: Finish the Seams
Wait at least 24 hours after setting before grouting.
Use unsanded grout to protect the honed surface from scratches.
Remove excess grout with a damp sponge and buff the surface after 30–45 minutes with a soft cloth.
Step 5 — Sealing: Protect and Preserve
Once grout has cured (approx. 72 hours), apply a penetrating sealer suitable for honed limestone.
Reapply periodically depending on moisture, wear, and environmental exposure.
Maintenance Tips
Clean only with pH-neutral stone cleaners.
Avoid acidic, bleach-based, or abrasive cleaning products.
Dust or wipe gently with a soft cloth to maintain the honed finish.
⚠️ Important Note:
Limestone is a natural stone and may vary in color and veining. Always dry-lay and inspect each piece prior to installation. Stonemarket USA is not responsible for installation errors or natural variations.